Fort Myers 239-356-8963
Fort Pierce 772-758-0381
Orlando 863-591-8241

Pompano Beach 754-704-5575
Tampa 813-896-2631

EMERGENCY RESPONSE

CREDIT CARD FORM

OUR CUSTOMERS

COMMERCIAL

HOA/PROPERTY MANAGEMENT

INDUSTRIAL

GOVERNMENT

Seawall Bulkhead Repair and Sealing Boca Raton

When your seawall or bulkhead needs repair and sealing in Boca Raton, contact us at Shenandoah. Seawalls and bulkheads are important structures constructed to protect coastal properties from erosion and wave action. Over time, these structures can deteriorate due to the harsh marine environment, storms, and general wear and tear. Repairing and sealing seawalls and bulkheads is vital to maintain their structural integrity and effectiveness.

Shenandoah is a well-established geotechnical contractor that specializes in providing innovative and environmentally friendly solutions for seawall and bulkhead repair and sealing. We have been operating since 1976 and have a track record of thousands of satisfied customers which speaks to our experience and expertise in the field. We use a deep injection polymer resin as a no-excavation solution to offer a rapid and cost-effective alternative to total replacement of seawalls and bulkheads.

For individuals or businesses in need of no-excavation seawall and bulkhead repair, sealing, and stabilization, get in touch with us at Shenandoah.

Seawall Bulkhead Repair and Sealing Boca Raton

Seawall & Bulkhead Sealing & Repair

Our Seawall rehabilitation services are designed to quickly stabilize the soil behind your wall to minimize excavation and minimize future damage.

Shenandoah's work withstood Hurricane Ian

In October of 2021, Shenandoah Construction was contracted by Lee County Department of Transportation to remediate seawall issues on the Sanibel Island Bridge Span A.

Sept. 28, 2022 Ian made landfall in southwest Florida as a Category 4 Hurricane with max winds of 150 mph.

Seawall still standing.  The material did its job.

Causes & Signs of Seawall & Bulkhead Failure:

Erosion, depressions, caving, sinkholes, and voids are visible in the ground behind the seawall, bulkhead or retaining wall. Cracks in wall slabs and caps, sagging or leaning slabs, slab deterioration and slab stains are all symptoms of seawall failure. These symptoms are caused by the erosion of the ground behind and under the seawall. Most often this is caused by cracks & leaks in the wall, improper drainage of the groundside water runoff, and/or soil/ground which was not compacted adequately during construction over fear of collapsing the wall.

Method for No-Excavation Seawall & Bulkhead Repair and Soil Stabilization:

 

Structural Chemical Grouting:

In granular soils, chemical grouting fills the voids and pockets in soils and subsoils pushing water out, then bonds them together, stabilizing and lifting the soils and structure while creating a significant increased weight bearing capacity. Structural chemical grouting is also used to repair fractures in seawall concrete and rock. When the grout is injected into the cracks and fractures it fills the voids with a powerful grabbing adhesive. It repairs the integrity of the concrete structure and creates a waterproof bond. This method is also widely used for government, infrastructures, industrial, commercial, and residential buildings, and properties.

Water Control Chemical Grouting:

Is most often used to stop water flow in soils and subsoils. Injection points are laid out in a well-defined grid/curtain, then under pressure, chemical grout is injected into the grid pattern which allows it to interconnect. This fills the voids in the soil and creates an underground curtain wall that prevents water migration. Water control grouting is widely used as a cost-effective way to stop leaks in seawalls, dam repair, underground utilities, storm drain & sewer systems. Underground grout curtain walls are created at water flow points to stop the leaks and water flow into the structure.

What are The Benefits of Shenandoah’s Chemical Grouting & Soil Stabilization Process?

Z

Weight Bearing Capacity Restored or Increased

Z

Material Reaches 90% of Strength in 15 Minutes, Assets can be Used Immediately

Z

Precision Pavement Leveling Often up to 1/8” Tolerance with Rapid Polymer Expansion

Z

Use of Small 5/8” Injection Holes, No Deconstruction Reconstruction

Z

Low Pressure Injection of Polymer down to Base and Subbase Soils

Z

One-Time Cost-Effective Method for Long Lasting Restoration

Z

Eco Friendly

Contact Shenandoah your Local Statewide Expert in Seawall & Bulkhead Sealing & Repair

When it comes to no excavation seawall & bulkhead repair and preserving your real estate assets don’t settle for anything than the best. With decades of hands-on experience, the professionals at Shenandoah have the geotechnical experience and skills to inspect and complete your job correctly, on time and budget. Our outstanding customer service, excellent craftmanship, use of only the best in industry materials and equipment and highly experienced team members ensure that your seawall stabilization project meets and exceeds all expectations. Contact us today for additional information.

Stormwater and Sewer Cleaning and Inspection

IRM PROGRAM

Our Inspection, Restoration, and Maintenance, (IRM) Program has helped maximize the performance of our customers sanitary and stormwater systems for over 45 years.